Bathroom Remodeling in Portland, From Design to Final Inspection
Grout that keeps cracking, a tub nobody uses, one sink for two people. We redesign the bathroom, build it with our in-house crew, waterproof every shower before the first tile goes up, and handle the permits through final inspection.
★★★★★ 4.9 on google | 46 google reviews | Owner operated | licensed in oregon | Free in-home estimate
Before
A dim bathroom with a patched, mismatched wall, worn brown floor, an older clawfoot tub, and a dark vanity under a brown-and-gray granite top.
After
A white and gray checkered floor, new toilet and freestanding tub, and a glass-topped half wall that opens the waterproofed walk-in shower to the room.
Detail
A floating wood vanity with a white top and backlit mirror, a brass light above, and picture-frame wainscoting wrapping every wall for added detail.
A Recent Bathroom Remodel in Portland, Start to Finish
The result: from dim and dated to bright and open: even lighting at the mirror, an open shower, a soaking tub by the window, and a bathroom the homeowner looks forward to walking into.
When Susanne first showed us her bathroom, it felt worn out the moment you walked in. The brown floor looked grimy no matter how it was cleaned, one wall was patched and mismatched from an old repair, and a beat-up vanity sat under a brown-and-gray granite top that clashed with everything around it. The walk-in shower was closed off behind a full wall, and a single ceiling light left the room dim.
We renovated it floor to ceiling. A white and light gray checkered floor now runs under a new freestanding tub with a floor-mounted filler and a new toilet. The shower wall came down to a half wall topped with glass, which opens up the whole room, and the shower was fully waterproofed before its custom tile went up. Picture-frame wainscoting wraps every wall. A floating wood vanity with a white top matches the tub and tile, and a backlit mirror above it seems to float too.
Our team handled the plumbing, electrical, waterproofing, and tile. Now it's a bright, warm room Sussane enjoys spending time in, not one she rushes out of.
The Bathroom Problems We Hear About Most
Most people don't search for a bathroom remodel on a whim. Something specific pushed them. If one of these is your reason, you're in the right place:
• The shower is starting to fail. Grout cracks again a month after you regrout, a tile sounds hollow when you tap it, the caulk in the corners turns black, or there's a stain on the ceiling below. Those are signs water is getting behind the tile.
• There's a tub nobody uses. You'd rather have a walk-in shower with room to move, or a real soaking tub instead of the builder-grade tub that came with the house.
•One sink, two people, every morning. No counter space, no storage, and a medicine cabinet that holds four things.
•The room never dries out. The mirror stays fogged, paint is peeling on the ceiling, and there's a musty smell. Usually the fan is too small, or it isn't vented outside at all.
•It's dated and worn out. Pink or mint tile from decades ago, a floor that's cracked or soft near the toilet, and fixtures you can't find parts for anymore.
•Getting in and out is getting harder. A high tub wall, no place to sit, nothing solid to hold on to.
Whatever brought you here, the fix works best when it's planned all at once: the shower, the plumbing behind it, the fan, the floor, and the vanity, in the right order.
Everything a Bathroom Remodel Can Include
You can remodel the whole room or just the parts that aren't working. Here's what we build, with a closer look at each on its own page.
Walk-In Showers: Tile, Slab, Panel and Steam
We build walk-in showers three ways. Tile gives you the most design options. Full stone slab walls give you large, seamless surfaces with almost no grout to clean. Waterproof wall panels go up faster, have no grout lines, and are simple to keep clean. All three depend on the waterproofing behind them, which we build before the finish goes on. We also build steam showers, which need a fully sealed enclosure and a vapor-tight build from the floor to the ceiling.
Request my free bathroom estimateVanities, Tops, Mirrors and Storage
We build custom vanities the same way we build our custom kitchen cabinets, and we'll also install a vanity you've already bought, plumbing hookup included. Going from one sink to two means moving the drain and supply lines, and that's part of the job. We finish the whole wall: the top, the backsplash, a mirror or medicine cabinet, vanity lighting, and built-in storage like towel and linen cabinets.
Request my free bathroom estimate
Replacing a Tub With a Shower
Taking out an alcove tub gives you room for a walk-in shower in the same footprint. It's more than swapping one for the other: the drain usually has to move and get larger, the valve moves up to shower height, and the floor and walls where the tub sat are rebuilt and waterproofed. If it's the only tub in the house, it's worth talking through whether to keep one somewhere else.
Request my free bathroom estimateBathtubs: Freestanding, Soaking and Tub-Shower Combos
We replace alcove tubs with new tub-shower combos with a tile, slab, or panel surround, and we install freestanding and soaking tubs. A freestanding tub needs its drain and floor-mounted filler plumbed exactly where the tub will sit, and a filled cast-iron or stone tub is heavy enough that the floor under it has to be checked. In a larger bathroom, a freestanding tub and a separate walk-in shower can share the room.
Request my free bathroom estimate
Floors, Tile Walls and Heated Floors
Floors in tile or waterproof vinyl, with heated floors under tile if you want warm feet on a January morning. Walls can be fully tiled or finished with waterproof panels throughout the room, not just in the shower. Before any new floor goes down, a soft or water-damaged subfloor gets repaired; tile over a floor that flexes will crack.
Request my free bathroom estimateLighting, Electrical and Ventilation
Good bathroom lighting comes in layers: light at the mirror at face height (on both sides is best, so there are no shadows), an overhead light for the room, and a light in the shower rated for wet locations including GFCI protection.
Then there's the fan, the most overlooked part of a bathroom. It should be sized for the room, ducted all the way outside rather than into the attic, and ideally on a timer or humidity sensor so it runs long enough to clear the moisture after a shower.
How Your Bathroom Remodel Works
Every bathroom follows the same four steps, in this order. Because everything is ready before demolition, the room is out of service only as long as the work takes.
01
Consultation and Estimate
We meet in your bathroom, talk through what isn't working and how you use the room, and assess the layout, plumbing, ventilation, and the condition of the floor and walls. You get a detailed, no-pressure estimate built around your goals and your budget.
02
Design and Materials
We guide you through the shower walls, tile, vanity, fixtures, lighting, and layout details. Then we order everything, so nothing is back-ordered while your bathroom is torn apart.
03
Templating and Preparation
Final measurements are taken, the custom vanity and any stone pieces go into fabrication, and deliveries are scheduled. You keep using your bathroom while this happens. Demolition goes on the calendar only when everything is ready.
04
Demolition and Installation
Our team takes out the old bathroom, makes any framing, plumbing, and electrical changes, and waterproofs the shower before any tile or panels go up. Then we install the floor, walls, vanity, fixtures, and lighting, coordinating inspections along the way. We work with care, speed, and precision to keep your time without the bathroom as short as possible.
What Demolition Can Uncover?
Bathrooms hide water damage better than any other room. When the old shower comes out, we sometimes find rotted framing, a soft subfloor, or an old shower that never had real waterproofing behind the tile. We look for the signs at the consultation, and if demolition turns up something that has to be fixed, we show you what we found before we go further.
How Long It Takes?
Most of the waiting happens in steps 2 and 3, while you still have a working bathroom. Once demolition starts, a typical bathroom remodel take 1week, depending on the scope, the materials, and the inspection schedule.
What We Need From You?
Your goals for the bathroom and a budget you're comfortable with
Decisions on finishes during design (we guide you through them)
The bathroom cleared of personal items before demolition day
If it's your only bathroom, let us know at the consultation so the schedule accounts for it
What Sets the Price of a Portland Bathroom Remodel
We don't publish bathroom price ranges. Every bathroom we build is custom, and a powder-room refresh and a primary suite with a steam shower have almost nothing in common. What we can tell you is exactly what moves the number, so you can decide where your money does the most.
Why Hire One Team for Your Bathroom
A bathroom remodel touches more trades per square foot than any other room: demolition, framing, plumbing, electrical, waterproofing, tile, drywall, paint, and cabinetry. Here are straight answers to the questions people weigh before they hire.
Why not a quick shower or tub replacement company?
If you want a new surround over the existing tub in a few days, that can be a reasonable choice. If you want to change the layout, build a custom tile or slab shower, fix water damage behind the walls, or move plumbing, that's a full remodel, which is what we do.
Wouldn't it be cheaper to hire each trade myself?
Sometimes the separate bids add up lower. But then you're the general contractor, and in a bathroom the order is everything: the plumber has to be done before the waterproofing, and the waterproofing has to be right before the tile. Our estimate covers materials, permits, and every part of the job, and we own the schedule.
Will I meet a salesperson and then never see them again?
No. Restore Renew Remodel is owner-operated, and Andriy is the main person on your job.
Primary Suites, Hall Baths and Powder Rooms
Each kind of bathroom has its own priorities. Here's what we usually plan around in each.
Primary Suite Bathrooms
This is where people want a double vanity, a bigger walk-in shower, maybe a freestanding tub, and heated floors. The planning question is space: fitting a tub and a separate shower takes room, and so do the clearances around a double vanity. We lay out the options on your actual floor plan so you can see what fits before you choose.
Hall and Kids' Bathrooms
The hardest-working room in the house. Durability comes first: a tub-shower combo if there are small kids to bathe, walls that wipe clean, a vanity with drawers, and a fan that actually runs. It's often the bathroom guests use too, so it needs to look good as well as hold up.
Powder Room and Half-Bath Remodels
With no shower or tub, a powder room is a small room where finishes go a long way: a statement vanity, tile, lighting, and paint. It's usually right off the living space, so guests see it. The plumbing is simple (a sink and a toilet), unless you're moving them.
Changing the Layout and Moving Plumbing
Most bathrooms stay in their footprint, and that's usually the most efficient choice. But sometimes the layout is the problem: the toilet is the first thing you see when the door opens, a tub sits where a shower should be, or the vanity is jammed behind the door.
Moving a toilet means relocating a 3-inch drain in the floor and keeping the right slope back to the main line. Moving a shower means opening the floor for the drain and the wall for the valve. How hard that is depends on what's underneath: over a basement or crawlspace it's straightforward, and over a finished ceiling or a concrete slab it takes more work. We'll tell you which moves earn their cost in your bathroom and which don't.
Leaking or Water-Damaged Bathroom? We Handle the Rebuild
A leak rarely stays where it starts. A shower seeping behind the tile, a slow drip under the vanity, or a failed toilet seal can soak the subfloor, rot the framing, and stain the ceiling below long before you notice. We find where the water is getting in, open up what's damaged, and rebuild it properly: new framing and subfloor where needed, new waterproofing, and new finishes.
Most of these repairs involve an insurance claim. We prepare a detailed estimate, work directly with your insurance company, and take care of the rebuild from tear-out to final inspection, so you're not left coordinating trades. Your insurer decides what your policy covers.
Request my free bathroom estimate Call About A bathroom rebuild (503) 890-8732What we repair:
• Showers leaking behind the tile or through the floor
• Vanity and sink leaks that have soaked the cabinet and the floor
• Toilets leaking at the base into the subfloor
• Tub drain and overflow leaks
•Damaged subfloor, framing, and the ceiling or wall on the other side
Water still running? Shut off the supply and call a plumber or water mitigation company first. We don't offer emergency service; we handle the repair and rebuild.
Bathroom Remodeling Across the Portland Metro
We're based at 7900 SE Luther Rd in Portland and remodel bathrooms throughout the Portland metro, including Beaverton, Hillsboro, Tigard, Tualatin, Sherwood, Wilsonville, Lake Oswego, West Linn, Oregon City, Milwaukie, Clackamas, Happy Valley, Gresham, and Troutdale.
Hours: Monday–Friday, 8 AM–5 PM. Saturday by-appointment-only and closed Sunday.
Call (503) 890-8732
How much does a bathroom remodel cost in Portland?
It depends mostly on your materials (shower walls, tile, the vanity and top, fixtures), then on whether fixtures move, lead times, and permits. We don't publish ranges because every bathroom we build is custom. The free in-home consultation gets you a detailed estimate covering materials, permits, and every part of the job. See "What Sets the Price" above for the details.
How long does a bathroom remodel take?
Materials are ordered before demolition, so you keep using your bathroom until the work starts. Once demolition starts, a typical bathroom takes [X–Y weeks], depending on scope, materials, and the inspection schedule.
Do I need a permit to remodel my bathroom in Portland?
It depends on the scope. In Portland, even replacing plumbing fixtures in the same location can require a plumbing permit, and electrical and mechanical work have their own trade permits. Interior-only remodels without load-bearing changes may qualify for the City's Simple Bathroom Program, which still requires a building permit and any trade permits. We figure out what your project needs, include it in the estimate, pull the permits, and coordinate inspections.
Can we stay home if it's our only bathroom?
Tell us at the consultation, and we'll plan the schedule with that in mind. Because materials are ordered and fabrication is lined up before demolition, the bathroom is out of service only for the build itself.
How do you keep a new shower from leaking?
Tile and grout aren't waterproof. What keeps water out of your walls and floor is the waterproofing layer behind them, so we build that before any tile or panels go up. Most shower leaks we see come from a shower built without it, or with it done wrong at the corners, the niche, or the valve.
Can you install a vanity I already bought?
Yes, including the plumbing hookup. We also build custom vanities if you'd rather have one sized to the space.
Can you turn my tub into a walk-in shower?
Yes. We remove the tub, move and resize the drain, raise the valve to shower height, and rebuild and waterproof the floor and walls. The walk-in showers page covers the options in detail.
What warranty comes with my new bathroom?
Manufacturer and product warranties on the items we install are passed through to you.
Can I get a bathroom estimate the same day?
For simpler projects, often yes. Bathrooms with stone tops or slab shower walls take a little longer, because we price the actual stone before giving you a number.
Get Your Free In-Home Bathroom Estimate
The consultation is free and happens in your bathroom, with no charge for us to come out. The estimate that follows is detailed and no-pressure, and it covers:
Every material: shower walls and waterproofing, tile or flooring, the vanity and top, fixtures, lighting, and the fan
Demolition and every trade the job needs
Permits and inspection coordination
Simple projects can often be estimated the same day. Bathrooms with stone vanity tops or slab shower walls take a little longer, because we price the actual stone before giving you a number.